ASSESSMENT OF RELIABILITY OF BRIDGE CONSTRUCTION SCHEDULE

Receipt date: 
31.05.2021
Bibliographic description of the article: 

Simonova O.A., Gnezdilova O.A. Otsenka nadezhnosti kalendarnogo grafika stroitel'stva mosta [Assessment of reliability of bridge construction schedule]. Molodaya nauka Sibiri: ehlektronnyj nauchnyj zhurnal [Young science of Siberia: electronic scientific journal], 2021, no. 1. [Accessed 11/05/21]

Year: 
2021
Journal number: 
УДК: 
658.5:624.21/.8
Article File: 
Abstract: 

Organizational and engineering reliability is one of the main indicators of the efficiency of construction organizational process, which determines the timeliness of work with a given probability, and obtaining the planned result in the conditions of the probabilistic nature of the work. The most suitable model for reflecting probabilistic construction processes is a network schedule that shows the correlation of works and allows to identify a «critical path» that determines the construction period of the facility.

The article presents the results of assessment of reliability of organizational and engineering solutions when designing a complex of works on construction of a bridge on a section of a railway line by method of statistical tests. The calculations make it possible to draw the following conclusion: the accepted work engineering and equipping with working and technical resources, make it possible to ensure the required level of reliability of the construction schedule only by creating temporary redundancy, which will provide additional time for making a rational management decision or a reserve of time necessary to restore the functioning of the flow in case of failure.

List of references: 

1.  Gusakov A.A. Il'in N.I. Organizatsionno-tehnologicheskaya nadezhnost' stroitel'stva [Organizational and engineering reliability of construction]. Moskow: Stroyizdat, 1984.169 p.

2.  Gmurman V.E. Teoriya veroyatnostei i matematicheskaya statistika:Ucheb. Posobie dlya vuzov [Theory of Probability and Mathematical Statistics: Textbooks for higher education.]/ M.: Higher education, 2002. 479 p.

3.  Hrustalev E.Yu., Larin S.N. Analiz metodov setevogo planirovaniya i upravleniya dlya formirovaniya program vosproizvodstva zhilishnogo fonda [Analysis of network planning and management methods for housing stock reproduction programmes]. Ekonomicheski'  analiz: teoriya i praktika [Economic Analysis: theory and practice], 2011, No. 23(230), pp. 59–66.

4.  Shalyagin G.L., Potapova I.V. Organizatsionno-tehnologicheskaya nadezhnost' stroitel'stva: metod posobie dlya provedeniya prakticheskih zanyati' [Organizational and engineering reliability of construction: method. manual for practical exercises ]. Habarovsk : Publishing house DVGUPS, 2006. 52 p.